Structural Concrete · El Monte, California
Logos Evangelical Seminary
Meier Concrete’s structural package for the four-story campus expansion in El Monte included foundations, slab-on-grade, vertical concrete and elevated slabs. The building includes ground-level parking.

- Location
- El Monte, California
- Concrete quantity
- Concrete area
- Approx. 18,600 SF
- Foundations
- Slab-on-grade
- Vertical concrete
- Elevated slabs and reinforcing