Structural Concrete · San Diego, California
Purl at Civita Civita Phase 3 Buildings A & B
Meier Concrete delivered structural concrete for two mixed-use podium buildings at Purl at Civita, a 434-apartment development in San Diego’s Mission Valley. The package included foundations, slab-on-grade, concrete columns and shear walls, and elevated post-tensioned decks over parking. The estimated concrete quantity was approximately 35,000 cubic yards.
- Location
- San Diego, California
- Concrete quantity
- Approx. 35,000 CY
- Concrete area
- Foundations
- Slab-on-grade
- Columns and shear walls
- Post-tensioned elevated decks